David Vignall Associates
  Home
Press Releases
Services
People
Case Studies
Papers & Presentations
News & Views
Links
Contact Us

    Dedicated Terminal for Mine, Indonesia

Seaport developed a feasibility study to establish how to build a dedicated terminal and landside connectivity to the mine in order to avoid any possible interference with local traffic on the nearby road system.
Seaport conducted site inspections and road infrastructure assessments; preliminary engineering evaluation with respect to design options. Hydrographic, geotechnical and other surveys in support of developing access to a dedicated terminal for the mine. Their logistics requirements were evaluated and presented with recommendations for supporting infrastructure development and an action plan prepared to develop the terminal.

More Case Studies